A homeowner in Leander owned a Cybertruck, a Powershare Gateway and a Universal Wall Connector, and wanted a labor-only install with permits. We backed up his subpanel, which holds all the essential loads of the house, plus the AC and septic, moved the well pump onto backup on site, re-ran the charger wire at the correct size, and finished in one day.
The home
A Leander home on Pedernales Electric Cooperative, with a 200 A main panel feeding a subpanel that holds all the essential loads of the house, a 50 A AC unit and a septic system. Water comes from a well pump in a separate small building that has its own panel.
The goal
The homeowner emailed several electricians asking for an installation-only quote: mount and wire the Gateway and Wall Connector he already owned, plus permits. He wanted to know the labor price, whether we needed a site visit, and our lead time.
We did not need a site visit. Our sales engineer asked for four things: a close-up of the open panel, a wider shot of the panel wall and meter, a video of the path to the charger, and the AC spec sticker. He sent them over the same week.
What we installed
- The homeowner’s Powershare Gateway, mounted on the same interior wall as the main panel, within 5 feet of it
- A 125 A breaker in the main panel feeding the Gateway
- Circuits moved into the Gateway: the 70 A subpanel with all the essential loads, the 50 A AC and the 30 A septic
- A new wire run from the well house to the Gateway, putting the well pump on the backed-up side on install day, at the homeowner’s request
- The existing Universal Wall Connector re-wired with the correct wire size
- Whole-home surge protection
- Leander electrical permit and inspection
The problems we solved
The AC. A 50 A AC unit pulls a big surge when its compressor starts. To start reliably on backup power it needs a soft-start kit, so we connected him with the HVAC company we work with to install one.
The water. On this property, no well pump means no water in the house. The homeowner asked on install day to put the pump on backup, so we expanded the scope on site and ran a new wire from the well house to the Gateway.
The charger. When we arrived, we found the existing Universal Wall Connector’s wires were undersized and could not safely carry 48 A over time. With his OK, we re-ran the wire at the correct size while we were there, so the charger the truck uses for Powershare can run at full power safely.
Install day
Once the quote was approved, we installed about ten days later. Mounting the Gateway, moving the circuits, adding the pump, re-wiring the charger and the surge protector were all done that day. Some Cybertrucks then need Tesla to activate Powershare, which can add a short wait after install.
The result
In an outage, the Gateway separates the home from the grid and the Cybertruck powers the subpanel, AC, septic and well pump. When the grid returns, it switches back on its own. We advised him to manage heavy loads in a long outage so the truck’s battery lasts. Within days he left us a five-star Google review: “They moved our well pump circuit onto the backup panel so the pump is covered during outages. Everything was done cleanly, professionally, and in a single day.”
Spec list
| Item | Detail |
|---|---|
| Vehicle | Cybertruck |
| Utility | Pedernales Electric Cooperative |
| Backup hardware | Powershare Gateway and Universal Wall Connector, homeowner supplied |
| Gateway feed | 125 A breaker in the 200 A main panel |
| Backed up | 70 A subpanel (all essential loads), 50 A AC (soft start required), 30 A septic, well pump |
| Extras | Charger re-wire, whole-home surge protection |
| Permit | City of Leander electrical permit and inspection |
| Install time | One day |
More on why the AC and pump mattered: what we learned installing Powershare in Texas homes. Learn more about Tesla Powershare installation.
Already own the hardware?
Send us photos of your panel, the wall with your meter, the charger path and your AC sticker. We usually quote the same day.
Frequently asked questions
Can I buy the Powershare hardware myself and pay only for installation?
Yes. This homeowner already owned the Powershare Gateway and Universal Wall Connector. We quoted labor, the Leander permit and inspection, and the optional add-ons.
Does the AC need a soft-start kit to be backed up?
It depends on how big the AC unit is. A smaller unit can often start on backup power without one. A bigger unit pulls a large surge when the compressor kicks on, and a soft-start kit brings that surge down so the car or batteries can handle it. We check your AC spec sticker before we quote and tell you if it needs one. On this Leander home the 50 A AC did, so we connected the homeowner with the HVAC company we work with to install it.
Can a well pump in a separate building be backed up?
Yes. On this job the well pump that supplies the house with water runs from its own panel in a separate building, and we added it to the backed-up side on install day.
How long did the Leander install take?
One day, about ten days after the quote was approved.